• Kiev
    Kiev
    (044) 333-96-17
    Schekavitskaya 30/39 of.15
  • Lviv
    Lviv
    (067) 618-40-96
    sq.Petrushevich 3, office 227

Free line
0 800 33 97 18

0 800 33 97 18
Kyiv
(044) 384-15-88
Shchekavitskaya 30/39,of.15

Lviv
(032) 220-15-88
Sq. Petrushevich 3, office 227

Wooden houses on frame technology

 

frame house

THE WHOLE WORLD USES THIS TECHNOLOGY, DO YOU STILL BE IN DOUBT?

  • TECHNOLOGY THAT IS USED BY AMERICANS AND EUROPEANS

     

  • HOUSE CONSTRUCTED BY NEW STANDARDS FOR HEAT SAFETY AND ELECTRICITY ECONOMY

     

  • CONSTRUCTION OF AESTHETIC AND TECHNOLOGICALLY ADVANCED MATERIALS
The frame house is the most popular construction technology in the south and north of the United States, in Canada, Norway and Germany. In these countries, a high standard of living, income and comfort of the population. Therefore, the residents of these countries thoughtfully and reasonably build their own frame houses, which are energy efficient, economical and, most importantly, fully comply with high European safety and environmental requirements.

 

Want to visit our construction site? Send a request for departure!

Неверный ввод
Неверный ввод
Неверный ввод
Неверный ввод

What is a "frame house"?

Wooden frame houses that are built according to frame technology are easily erected structures, which in their small cost and qualities (reliability, strength, durability) are not inferior to brick houses, and also have a number of economic advantages in construction and maintenance over traditional brick construction.

WHEN THE FRAME HOUSE IS THE BEST SOLUTION?

box

When you need to build a house quickly and quickly move into it.

  • The minimum construction time is 2-3 months;
  • Independence of construction from seasonality and relief of the site;
  • Easy adaptation of the structure to any layout;
  • Ideal conditions for quick and easy interior decoration.
family

When you need an inexpensive and warm home for parents.

  • Energy efficiency of housing - the house warms up quickly and retains heat for a long time, which allows significant savings on utility bills.
relax

When you need a small house for a country holiday.

  • Low weight design - saving on the foundation;
  • Small financial investments in the work - the cost of construction is much lower than the construction of traditional technologies;
  • The house does not require constant maintenance and heating - it is just waiting for your arrival.

POPULAR PROJECTS OF FRAME HOUSES EURO HOUSE

eh-073
057
cheap_house
eh-032
eh-095
eh-084

 

ORDER RESPONSE AT HOME

 

ORDER PROJECT HOUSES

Request

Fill out the application and your consultant will contact you shortly to clarify the information.

Неверный ввод Неверный ввод Please specify your email address.
 

What is the frame house?

     1. FOUNDATION

 

family

Typical strip foundation. It is universal on equal sites and at low underground waters.

karkasnye_doma
Typical pile foundation. It is used with existing differences in the heights of the site and high groundwater.

The foundation is the foundation of a building that takes on the load of the weight of the structure. Depending on the conditions on the site, we use a strip foundation or a pile-screw.

Ribbon foundation is used in the case when the land is flat, there are no drops and slopes. Depth of the tape base 90 cm, width 30 cm

If the site is located on a slope or there is high groundwater, then the pile-screw.

The sequence of laying the strip foundation:

  1. Marking, repeating the location of the structure, peg and cord;
  2. Trenching, drilling, laying waterproofing material;
  3. Installation of formwork, linking of reinforcement and installation of mortgages for communications;
  4. Pouring concrete.

The sequence of laying the pile-screw foundation:

  1. Piling in the ground: screwing or driving the pile;
  2. Cutting the pile and pouring the pile with concrete, which makes the pile stronger;
  3. Weld head and seam processing;
  4. Binding of the finished base using a channel.
     2. WALLS
karkasnye_doma
  1. Interior finish with plasterboard 12.5 mm on a metal profile.
  2. Vapor barrier film
  3. Frame frame 145 × 45 mm.
  4. Mineral heater 150 mm.
  5. OSB-3 sheathing 12 mm.
  6. Exterior decoration:
  • ventilated facade: windproof membrane + wood or PVC-paneled on wooden profile;
  • plaster facade: mineral heater 50-100 mm or foam polystyrene 100 mm + plaster facade on the reinforcement 10-20 mm.

The thickness of the wall:

  • ventilated facade: 260 mm
  • plaster facade: 322 mm

The parameter of heat transfer R from 3.3 to 5.7 m2*/W

The second stage of construction is the installation of a framework consisting of vertical posts, horizontal and strapping beams, and overlapping beams of the truss system (consisting of rafters, lathing, counterbathing). The “skeleton” of the structure should be of high-quality wood, dried, not subject to mold / fungus and treated with antiseptics and fire protection.

The sequence of installation of the frame:

  1. installation of lower trim bars: applying waterproofing, fixing the bars between each other, laying on the foundation;
  2. fixture bars to the foundation;
  3. installation of vertical corner posts;
  4. installation of intermediate racks;
  5. installation of the upper trim bars;
  6. reinforcement of the frame: fixing with hacks or braces;
  7. installation of ceiling beams; 8 installation truss system.

The frame is sheathed with orientation-chipboard (OSB). Their use is due to the fact that oriented strand boards give strength to walls, firmly hold fasteners, under the influence of moisture they retain their shape and properties, and the load is redistributed along with the plane of the plate. In the manufacture of OSB used natural resins for bonding chips. The weight of the plates is much less than similar materials.

Insulation plates are stacked as tightly as possible from the inside of the frame between the beams in order to avoid gaps. The most reliable material is mineral wool, since its base is natural material - stone or sand, thanks to which the insulation is not subject to burning, is resistant to moisture, is not deformed and is absolutely non-toxic

     3. ROOF
roof
  1. Roof covering (metal tile, shingles)
  2. Cross crate
  3. Contra-lattice
  4. Waterproofing membrane
  5. Mineral insulation
  6. Rafters
  7. Vapor barrier
  8. Filing

The roof consists of rafters, roofing membrane, counter rails, lathing, metal tile (or shingles with OSB-plates under it).

Houses built on frame technology, do not require time for shrinkage. Therefore, after installing the roof, you can proceed to the installation of windows. This process is performed in accordance with all requirements for the installation of PVC structures: accurate measurements, compliance with levels, the choice of mounting method, sealing gaps and more.

     3. ENGINEERING
 electro

Engineering networks built into the walls:

  1. Electrical cables are mounted in the metal hose and fixed in the junction box, laid on the outer side of the walls;
  2. Heating and water supply systems are installed in a special thermal insulation for pipes;
  3. Pipes of water supply are stacked on the draft screed of the first floor, in the walls and ceilings.

The company EvroHauz specializes in the construction of frame houses in Kiev, Kiev region, as well as throughout Ukraine for many years and offers a large selection of model projects. Such projects are thought out to the smallest detail in the convenience of living in them for families with children, dividing living space into work areas and recreation areas. They take into account modern requirements for daylight illumination of the room and already have garages and technical premises for the heating system in breading.

Due to the well-thought-out technology of heat insulation and the use of environmentally friendly materials, the house built on the frame construction technology, as a result, has excellent thermal insulation properties and is pleasantly surprising with its low energy costs.

Also, our clients have the opportunity to develop an individual project taking into account their personal wishes and tastes. Such projects will distinguish your home with an individual style, will take into account the future increase in family, hobbies and hobbies of the owners, provide you with personal recreation areas, creative workshops and large living rooms for meeting friends. With a slight difference in the cost of an individual project, you get a house designed exclusively for you.

Being engaged in the construction of turnkey houses for more than 8 years, we adapted the frame construction technology to the Ukrainian climate, tested all the wall structures and checked the associated building materials. EuroHouse cares about customers and uses in its work only the best materials of world and Ukrainian suppliers - high-quality and eco-friendly:

By contacting EuroHouse, you will fulfill your dream, entrust the construction of the house to professionals, save financial resources and protect the environment. You can ask a question to a specialist in any way convenient for you.

You can view the price for frame house construction here

How we work with clients

Design and pricing phase  karkasnye_doma Select a project. You can order a finished project or realize your own vision of the house. Development of the project, approval of the sketch with the customer, preparation of all project documentation (architectural, construction and design solutions), engineering equipment and networks.
Already at the meeting we give a clear price. There is a calculation of the quotation, price approval with the client and the signing of the contract.
Stage of signing the Treaty karkas After approval of the price, we sign this Agreement with you from a legal entity and list all the stages of payments that will be carried out according to the results of acts of work performed.
Building dom Then begins pouring the foundation and the preparation of a wooden frame, the signing of the Act of acceptance of works.
karkasnye_doma Payment for the next stage and the construction of the frame, the signing of the Act of acceptance of works.
doma Carrying out finishing works, signing of the Act of acceptance of works.
karkasnye Additional services related to home improvement, infrastructure development, landscape design.

 

SUBMIT YOUR APPLICATION

 

SEE PRICES

Request

Fill out the application and your consultant will contact you shortly to clarify the information.

Неверный ввод Неверный ввод Please specify your email address.
 

Неверный ввод
Неверный ввод
Неверный ввод
{captcha:body} {captcha:validation}

Kyiv

(044) 333-96-17

Lviv

(067) 618-40-96

e-mail

info@eurohouse.ua

  The section for the media

Calculation of the project

leave your phone and our staff will contact you to clarify details

Please let us know your name.
Please write a subject for your message.
Неверный ввод
Please let us know your email address.
Неверный ввод
Неверный ввод
Please let us know your message.
Неверный ввод